kitchen cabinets

Another week has gone by without our builder.  We’ve made good progress on a few fronts anyway.  All doors and windows have been painted (at least all that we wanted to paint before we move in).  This week we also installed all the kitchen cabinet handles and pulls.  That was a bit nerve wracking because Lori decidedly did not want any extra ventilation holes in the doors and drawers which meant I had to do it right the first time.  That’s not my customary way of operating but I managed to pull it off anyway.  Everything is where it should be with no extra holes.

There are only a few items to get done before we move in.  Things like install a septic system, hook up all the plumbing, install flooring, build a deck, build front steps, etc..  How long can any of that take?  We’ll be done in no time.